RER

2007 Schools Wikipedia Selection. Related subjects: Railway transport

RER
Paris public transport
Métro lines
line 1 line 7bis
line 2 line 8
line 3 line 9
line 3bis line 10
line 4 line 11
line 5 line 12
line 6 line 13
line 7 line 14
RER lines
line A line D
line B line E
line C
Suburban rail (Transilien)
Saint-Lazare Nord
La Défense Est
Montparnasse Lyon
Airport shuttles
CDGVAL Orlyval
Bus
Bus (RATP) Noctilien
  Bus (Optile)  
Tramway
Tramway T1 Tramway T2
Tramway T3 Tramway T4

The RER (Réseau Express Régional, IPA /ɛʀøɛʀ/, "Regional Express Network") is an urban rail network in the Île-de-France région, notably Paris and its agglomeration.

The RER is a hybrid transportation system, being an integration of modern city-centre subway and pre-existing regional rail. Within the city of Paris, the RER serves as an express network offering multiple connections to the Paris Métro. The essential central part of the RER was completed by a massive civil engineering effort between 1962 and 1977, and features some unusually deep and spacious stations. The RER network is still expanding today — the new line E was inaugurated in 1999. As of 2006 the RER comprises five lines: A, B, C, D and E.

The RER currently serves 246 stops and runs over 571 km (355 miles) of track. 33 stops are served inside the city of Paris itself. Each line crosses the city proper almost exclusively underground and on dedicated tracks. Due to its hybrid nature, some parts of RER lines are operated by the city transport authority managing the Métro ( RATP) and others by the national rail company ( SNCF). In 2004, 782.9 million journeys were made on the five lines of the RER.

History

Origins

The origins of the RER can be traced back to the 1936 Ruhlmann- Langewin plan of the Compagnie du Chemin de Fer Métropolitain de Paris (Company of the Metropolitan railway of Paris) for a wide-sectioned "métropolitain express" (express metro). As the CMP's post-war successor, the RATP revived the scheme in the 1950s, and in 1960 an interministerial committee decided to go ahead with construction of a first, east-west, line. As its chief inspiration, the RATP was granted authority to run the new link and the SNCF thus ceded operation of the Saint-Germain-en-Laye line (to the west of Paris) and the Vincennes line (to the east). The embryonic (and as yet unnamed) RER was conceived in the 1965 Schéma directeur d'aménagement et d'urbanisme as an "H"-shaped rapid transit network (that is, with two north-south routes). Only a single north-south axis crossing the Left Bank has so far come to fruition, although the Métro's Line 13 has been extended to perform a similar function.

Pioneering

In the first phase of construction the Saint-Germain and Vincennes lines became the ends of the east-west Line A, whose central section was opened station by station between 1969 and 1977. On its completion the Line A was joined by an initial southern leg of the north-south Line B. During this first phase six new stations were built, three entirely underground and all on a grand scale.

The RER A at Charles de Gaulle - Étoile.
Enlarge
The RER A at Charles de Gaulle - Étoile.

Construction was ceremonially inaugurated by Robert Buron, Minister for Public Works, at the Pont de Neuilly on 6 July 1961. The rapid expansion of the La Défense business district in the west made this western section of the new east-west route a priority. Such was the scale of the work that it was not until 12 December 1969 that the first new station — and the RER name — was inaugurated, at Nation on the eastern section. Nation thus became temporarily the new terminus of the Vincennes line from Boissy. A few weeks later came the long-awaited opening of the western line from Étoile (not yet renamed after Charles de Gaulle) to La Défense. A simple shuttle service, this western section was extended eastward to the newly-built, central Auber station on 23 November 1971, and westward on 1 October 1972 to Saint-Germain-en-Laye by means of connection to the Saint-Germain-en-Laye line (the oldest railway line in France) at Nanterre.

The RER network truly came into being on December 9, 1977 with the joining of the Nation- Boissy and Auber- Saint-Germain-en-Laye segments as the eastern and western halves of the RER Line A at the just-completed hub station of Châtelet - Les Halles in the heart of Paris. The southern Ligne de Sceaux was simultaneously extended from its terminus at Luxembourg to meet Line A at Châtelet – Les Halles, becoming the new Line B. The system of line letters was introduced to the public on this occasion, though it had been used internally at RATP and SNCF for some time already.

Completion

A second phase, from the end of the 1970s, was of more soberly paced completion. The SNCF gained the right to operate its own routes outright, which were to become lines C, D and E. Extensive sections of suburban track were added to the network but only four new stations were built. Of these, two were comparable in audaciousness to those of the 1970s. The network as it is today was completed in the following stages:

  • Line C (following the Left Bank of the Seine) was added in 1979, involving the construction of a short cut-and-cover link between Invalides and Musée d'Orsay.
  • Line B extension to the Gare du Nord (1981) and the north (1983) was effected by means of a new deep tunnel from Châtelet - Les Halles.
  • Line D (north to south-east, via Châtelet – Les Halles) was completed in 1995, using a new deep tunnel between Châtelet – Les Halles and Gare de Lyon. No new building work was necessary at Châtelet – Les Halles, since — in an example of superb planning — additional platforms for an eventual Line D had been built at the time of the station's construction 20 years earlier.
  • Line E was added in 1999, connecting the north-east with Gare Saint-Lazare by means of a new deep tunnel from Gare de l'Est.

Finance

Two aspects of the RER's pioneering phase in the 1960s and 1970s are particularly noteworthy. The first is the spectacular scale and expense of the enterprise. For example, 2 billion  FRFn were committed to the project in the budget of 1973 alone. This equates to roughly €1.3 billion in 2005 terms, and closer to double that when stated as a proportion of the region's (then much smaller) economic output (Gerondeau C, 2003). This and subsequent spending is partly explained by the regional versement transport ("transport contribution"), a small levy made on businesses that evidently benefit from the vast labour market put at their disposal by the RER. This peculiarly French invention was passed by a law in June 1971 and has been a permanent source of revenue for transport investment ever since.

Second, it is striking how little public consultation was made over such expenditures and tax innovations. Contrary to the lively public debate which accompanied the building of the Métro 70 years previously, the RER aroused little media attention and was essentially decided behind the closed doors of cabinet meetings. The will, and even idealism, of a handful of people — notably Pierre Giraudet, Directeur Général of the RATP — proved decisive in persuading ministers to grant credits. So too did the united front presented by the RATP and SNCF and their success at keeping within their budgets. Given the subsequent success of the RER, the investment can in retrospect perhaps be considered money well spent.

Map

Central network of the RER at a geographically accurate scale
Enlarge
Central network of the RER at a geographically accurate scale
Vector map of the network
Enlarge
Vector map of the network

Trains

The RER B at La Plaine - Stade de France.
Enlarge
The RER B at La Plaine - Stade de France.

The overall predominance of suburban SNCF track on the RER network explains why RER trains drive on the left, like SNCF trains (except in Alsace-Moselle), and contrary to the Métro where trains drive on the right. RER trains run by the two different operators share the same track infrastructure, a practice called interconnection. On the RER, interconnection required the development of specific trains (MI79 series for Materiel d'Interconnexion 1979, and MI2N series for Materiel d'Interconnexion à 2 niveaux (two-level interconnection stock)) capable of operating under both the 1.5 kV direct current on the RATP network and the 25 kV / 50 Hz alternating current on the SNCF network. The MS61 series (for Matériel Simple 1961) can be used only on the 1.5 kV DC network.

The RER's tunnels have unusually large cross-sections. This is due to a 1961 decision to build according to a standard set by the Union Internationale des Chemins de Fer, with space for overhead catenary power supply to trains. Single-track tunnels thus measure 6.30 m across and double-track tunnels up to 8.70 m - meaning a cross-sectional area of up to 50 square metres, larger than that of the stations on many comparable underground rail networks.

Lines

Paris RER lines
Line Name Opened Last
extension
Stations
served
Length Average
Interstation
Journeys made
(per annum)
Line A 1977 1994 46 108.5 km / 67.5 miles 2,411 m 272,800,000
Line B 1977 1981 47 80.0 km / 49.8 miles 1,739 m 165,100,000
Line C 1979 2000 86 185.6 km / 115.5 miles 2,184 m 140,000,000
Line D 1987 1995 58 160.0 km / 99.6 miles 2,807 m 145,000,000
Line E 1999 2003 21 52.3 km / 32.5 miles 2,615 m 60,000,000

Stations

Ten new stations have been built under the heart of Paris since the 1960s as part of the RER project. The six stations of Line A opened between 1969 and 1977 are:

  • Nation (1969): deep construction at the Place de la Nation
  • Charles de Gaulle - Étoile (1970): deep construction at the site of the Arc de Triomphe
  • La Défense (1970): near-surface construction beneath the current site of the Grande Arche de la Défense, just outside the Paris perimeter
  • Auber (1971): deep construction near Gare Saint-Lazare; once the largest underground station in the world
  • Châtelet - Les Halles (1977): near-surface construction on the site of the former marketplace, today perhaps the largest underground station in the world
  • Gare de Lyon (1977): near-surface construction beneath and alongside the mainline SNCF station

Some controversy followed the construction of the Line A. Using the model of the existing Métro, and unlike any other underground network in the world, engineers elected to build the three new deep stations ( Étoile, Auber and Nation) in the configuration of single monolithic halls with lateral platforms and no supporting pillars. A hybrid solution of adjacently-positioned halls was rejected on the grounds that it "completely sacrificed the architectural aspect" of the oeuvre (Gerondeau 2003, p31). Yet the scale in question was vast: the new stations cathédrales were to be up to three times longer, wider and taller than Métro stations, and hence 20 or 30 times more voluminous. Most importantly, unlike the Métro they were to be constructed entirely underground. The decision turned out to be expensive - around FFr1.2 billion for the three stations, equivalent to €1.2 billion in 2005 terms, with the two-level Auber the costliest of the three. The comparison was obvious and unfavourable with London's Victoria Line, a deep line of 22 km constructed during the same period using a two-tunnel approach at vastly lower cost. However, the three stations represent undeniable engineering feats and are noticeably less claustrophobic than traditional underground stations.

Haussmann - Saint-Lazare on the RER E.
Enlarge
Haussmann - Saint-Lazare on the RER E.

Only two stations were inaugurated to complete Lines B, C and D:

  • Gare du Nord (1982): near-surface construction on two levels
  • St-Michel - Nôtre-Dame (1988): deep construction on an existing stretch of the Line B between Luxembourg and Châtelet - Les Halles and remarkable for its two-tunnel architecture, common to all other deep underground systems but unique in Paris

Two stations were added to the network as part of the new Line E in the 1990s. They are notable for their lavishly spacious deep construction, a technique not used since Auber. Although similar to the three 1960s "cathedral stations" of the Line A, their passenger traffic has so far proved vastly lower.

  • Magenta (1999): deep construction serving both Gare du Nord and Gare de l'Est
  • Haussmann - St-Lazare (1999): deep construction serving Gare Saint-Lazare and Auber

Usage

The social and economic impact of the RER is difficult to overstate. Journey times, particularly on east-west and north-south routes, have been cut spectacularly (and thanks to the cross-platform connection at Châtelet - Les Halles, even "diagonal" trips are rapid). As a result, the network has been an extraordinary popular success since its opening.

Lines A and B reached saturation relatively quickly, exceeding by far all traffic expectations. Despite the partial introduction of double-decker trains, and frequencies of as little as 2 minutes, the central stations of Line A are now critically crowded at peak times. Since both Metro and surface transport is equally congested at these times (and significantly slower), the RER's value to the economy of Île de France cannot be in doubt.

Used for leisure journeys, the RER represents no less of a revolution. By bringing far-flung suburbs within easy reach of central Paris, the network has significantly aided the reintegration of the traditionally insular capital with its periphery. The evidence of this social impact can be seen at Châtelet - Les Halles, whose neighbourhood is now crowded with suburbanites (banlieusards) on evenings and weekends.

Future developments

The main hypotheses for future extensions to the RER focus on the Line E, which currently ends at Haussmann - St-Lazare(doing only one side fo Paris, unlike all the other RER lines). Various Line E extensions have been proposed:

  • Eastwards from Chelles-Gournay to Esbly and Meaux
  • Eastwards from Tournan to Coulommiers
  • Westwards from Haussmann - St Lazare to Saint-Nom-la-Bretèche and Versailles Rive-Droite, via a new station at Champs-Elysées - Clémenceau and Gare Montparnasse.

A new Line E station has also been proposed at Rue de l'Évangile on the existing approach to Gare de l'Est, with a tentative opening date of 2010.

Plans exist for a line F, which would connect Argenteuil to Rambouillet via the existing tracks of the St-Lazare and Montparnasse rail networks. A new tunnel would be bored below Paris, with the creation of a station at Invalides. At present, this is not foreseen before 2020.

International comparison

The Paris RER is often compared with systems such as S-Bahn trains in Germany and Austria or Cercanías in Spain. That comparison is mainly due to the fact that they share the fact that they serve outer suburbs and fully cross the city in serving various stations. In that extent, the rail network which is currently built in the Brussels region is also called RER, and French speaking Switzerland also designates by "RER" what German speaking Switzerland calls "S-bahn".

However, there are two specificities in the Paris RER that we don't find in most other systems: Firstly, each RER line runs on independent dedicated track (at the single exception of the tunnel between Gare du Nord and Châtelet, which is used by both lines B and D) and each RER line has its dedicated platforms in stations. Secondly, the Paris RER serves mainly the Paris urban area and very few satellite towns. The only exceptions being the Southern branch of line C and the outer sections of line D.

Retrieved from " http://en.wikipedia.org/wiki/RER"